• <rt id="9jkck"></rt>

  • <tr id="9jkck"></tr>
    av 日韩 人妻 黑人 综合 无码,亚洲一区二区三级av,久操资源站,jizz国产免费观看,最近中文国语字幕在线播放,中文字幕 日韩 人妻 无码,中文字幕在线精品视频入口一区,国产精品天干天干综合网

    為你詳細(xì)介紹產(chǎn)品中心的產(chǎn)品內(nèi)容,包括產(chǎn)品中心的用途、型號(hào)、范圍、圖片等,在這里你可以得知產(chǎn)品中心的新聞以及市場(chǎng)產(chǎn)品中心價(jià)格。

    新聞資訊

    What Kind Of Tests Should Be Done On Oil-Immersed Transformers During Operation?

    What kind of tests should be done on oil-immersed transformers during operation?

    In order to ensure that the oil-immersed transformer can operate normally, the following tests should be carried out frequently: Temperature test. Whether the oil-immersed transformer is operating normally or not, the temperature is very important. The regulations stipulate that the upper oil temperature shall not exceed 85C (that is, the temperature rise is 55C). Generally, oil-immersed transformers are equipped with special temperature measuring devices. Load determination. In order to improve the utilization rate of oil-immersed transformers and reduce the loss of electric energy, it is necessary to determine the power supply capacity that the oil-immersed transformer can truly bear during the operation of the oil-immersed transformer. The measurement work is usually carried out during the peak period of electricity consumption in each season, and is measured directly with a clamp ammeter. The current value should be 70 to 80% of the rated current of the oil-immersed transformer. If it exceeds, it indicates overload and should be adjusted immediately. Voltage measurement. Regulations require that the voltage variation range should be within ±5% of the rated voltage. If it exceeds this range, taps should be used to adjust the voltage to the specified range. Generally, a voltmeter is used to measure the secondary coil terminal voltage and the terminal voltage of the end user respectively. Insulation resistance measurement. In order to keep the oil-immersed transformer in normal operation, the insulation resistance must be measured to prevent insulation aging and accidents.

    When measuring, try to stop the oil-immersed transformer from running. Use a megometer to measure the insulation resistance value of the oil-immersed transformer. It is required that the measured resistance is not less than 70% of the previously measured value. When using a megohmmeter, the low-voltage coil can use 500 volts. voltage level. It has been theoretically confirmed that the voltage ratio between the primary coil and the secondary coil of the oil-immersed transformer is related to the ratio of turns between the primary coil and the secondary coil, which can be expressed by the following formula: primary coil voltage/secondary coil voltage = primary coil turns/secondary The number of turns in a coil indicates that the more turns, the higher the voltage. So it can be seen that the secondary coil is less than the primary coil, which is a step-down oil-immersed transformer. The opposite is a step-up oil-immersed transformer.


    主站蜘蛛池模板: 99国产欧美另类久久久精品| 国产亚洲色视频在线| 三上悠亚久久精品| 免费视频爱爱太爽了| 国产精品国三级国产专区| 中文字幕人妻在线精品| 亚洲男人的天堂久久香蕉| 视频一区视频二区卡通动漫| 国产不卡一区二区在线| 成人午夜在线观看刺激| 夜鲁夜鲁很鲁在线视频 视频| 国产中文三级全黄| 中文有无人妻vs无码人妻激烈| 国产精品自在线拍国产手机版| 成人一区二区三区在线午夜| 日本一区二区精品色超碰| 亚洲国产欧美一区二区好看电影 | 日本三级理论久久人妻电影| 五月婷之久久综合丝袜美腿| 国产一区二区不卡自拍| 欧美寡妇xxxx黑人猛交| 亚洲精品日韩在线丰满| 久久亚洲精品11p| 久久亚洲精品国产精品尤物 | 久久精品国产中文字幕| 亚洲男女羞羞无遮挡久久丫| 美女胸18下看禁止免费视频| 深夜免费av在线观看| 人人妻人人澡人人爽| 精品国产亚洲一区二区三区| 偷窥国产亚洲免费视频| 成年无码av片在线蜜芽| 极品无码国模国产在线观看| 福利成人午夜国产一区| 一出一进一爽一粗一大视频| 午夜精品一区二区三区成人| 国产肉丝袜在线观看| 91精品久久一区二区三区| 一区二区三区鲁丝不卡| 亚洲天堂领先自拍视频网| 中文字幕日韩国产精品|